PBL Technical/IT Experts

PBL Technical/IT Experts

TECHNICAL/IT EXPERTS 

MR. MUJIB RAHIMAN, LIBRARIAN, KV KANJIKODE

  • Design and Maintenance of Regional Level PBL Blog. Technical assistance to PBL Coordinating Principals  and teachers  of Palakkad Cluster and Kannur Cluster

MR. RAKHESH, PGT CS, KV ADOOR

  •  Technical assistance to PBL Coordinating Principals  and teachers of Trivandrum Cluster 

MR. SOJU, PGT CS, KV INS DRONACHARYA

  •  Technical assistance to PBL Coordinating Principals and teachers of Ernakulam Cluster


The above technical experts may be contacted for any assistance related to setting up of the Vidyalaya level blogs and for various IT softwares and utilities required for the implementation of PBL in the Vidyalayas.
PBL Coordinators and Schools

PBL Coordinators and Schools

PBL@KVS RO Ernakulam 21:52 Add Comment
DR. S NALAYINI, PRINCIPAL, KV KANJIKODE
KV NO.1 PALAKKAD
KV KANJIKODE
KV NO.1 CALICUT
KV KAVARATI


MRS. MAYA GEORGE, PRINCIPAL, KV INS DRONACHARYA
KV INS DRONACHARYA
KV PORT TRUST
KV NO.1 KOCHI
KV NO 2 KOCHI
KV ERNAKULAM


MR. SURESH BABU, PRINCIPAL, KV ADOOR
KV ADOOR SHIFT 1
KV ADOOR SHIFT 2
KV PANGODE
KV CHENNEERKARA


MRS. AMRUTHA BALA, VP,KV  NO. 1 PALAKKAD
KV EZHIMALA
KV KANHANGAD
KV PERINGOME
KV NO. 1  KASARAGOD
KV NO.2 KASARAGOD


MRS. SREELEKHA S, VP, KV PALLIPURAM
KV PALLIPURAM
KV KOLLAM
KV AKKULAM


MR. MATHEW ABRAHAM, VP, KV PATTOM
KV PATTOM SHIFT 1
KV PATTOM SHIFT
KV SAP


MR. TAV SHARMA, VP, KV PAYYANNUR
KV PAYYANNUR
KV KELTRON NAGAR
KV KANNUR
KV THALASSERY
KV MAHE


MR. KUMARA MOHAN, VP, KV OTTAPPALAM
KV OTTAPPALAM
KV MALAPPURAMA
KV KALPETTA


MR. AGIMON AC, VP KV NAD ALUVA
KV NAD ALUVA
KV IDUKKI
KV KAYANKULAM
KV KADTHURUTHY
KV RB KOTTAYAM


MRS. PHILOMINA MACHERY, VP, KV THRISSUR
KV THRISSUR
KV RAMAVARMAPURAM
KV NO.2 CALICUT


One Day Workshop on Project Based Learning

A One Day Workshop on Project Based Learning was organised by KVS RO Ernakulam on 29 July 2016 at Kendriya Vidyalaya Ernakulam. 3 Principals, 7 Vice Principals and 38 teachers from the Kendriya Vidyalayas of Ernakulam Region attended the workshop.

Dr. Uma Sivaraman, Deputy Commissioner interacted with the participants and the importance of PBL to develop 21st century skills among the students. She urged congratulated the teachers who have already initiated PBL in their vidyalayas and urged others to be the torch bearers of change in their respective vidyalayas.

Mrs. Meenakshi, Assistant Commissioner introduced the concept of Project Based Learning and explained the methodology to be adopted by the Kendriya Vidyalayas in implementing PBL in their schools.

Coordinators were assigned different Kendriya Vidyalayas to implement PBL. Three technical experts were also been assigned to provide technical/IT assistance to the schools.

List of Coordinators and Kendriya Vidyalayas
List of Teachers attended the workshop
Team of Technical Experts

PROCEDURE AND TIMELINE

PROCEDURE AND TIMELINE


“Tell me and I forget; teach me and I remember; involve me and I learn”
                                 
PROCEDURE AND TIMELINE
DATE
EVENT
REMARKS
01.06.2016
Selected ten schools withPrincipal/ VP as coordinator.
Email ids are created
School
Coordinator
K.V.Pattom
Mr.Abraham Mathew
K.V. Pallipuram
Mrs.Sreelekha
K.V. Adoor
Mr.Suresh Babu
(technical  support-  Mr.Rakesh)
K.V. INS Dronacharya
Mrs.Maya George
(technical  support-Mr.Soju)
K.V. NAD Aluva
Mr.Ajimon
K.V.Thrissur
Mrs.Philomina Machery
K.V.No1, Palakkad
Mrs.Amrutha bala
K.V.Kanjikode
Dr.S.Nalayini
(Technical support- Mr.Mujib)
K.V.Ottappalam
Mr.Kumara Mohan
K.V.Payyannur
Dr.TAV Sharma
03.06.2016
The project coordinator is to select one teacher teaching classes VI to X. The topic and focus groups are selected-Project Plan covered in Lesson 1 & 2
Regional level blog is created.
04.06.2016
Define phase of the project - Lesson 2
Online training starts
08.06.2016
Plan phase of the project -   Lesson 3

13.06.2016
Work plan-------------------- Lesson 4

17.06.2016
Do phase of the project --- Lesson 5

22.06.2016
Review phase of the project - Lesson 6
Manage phase of the project - Lesson7

25.06.2016
Creating blog at Vidyalaya level

30.06.2016
Submission to AC
Linking with the RO blog 
11.07.2016
One day workshop with core group of 10 VPs and 10 teachers + 5 teachers from each cluster
Orientation program
 in-class training
13.07.2016
Launching the project at Vidyalaya level

13.07.2016-13.08.2016
Doing the project
Post training assignment
13.08.2016
Project submission



WORK PLAN

Sl.
No
TASK
SUBTASK
ROLE
START DATE
END DATE
PRODUCT



PBL Lesson 7 - The Manage Phase

PBL Lesson 7 - The Manage Phase

Project Plan – Lesson 7
The Manage Phase

(7.1) Process Management:
List tasks that will be used to manage the process of conducting the learning

(7.2) Student Preparation:
Describe how students will be prepared for the project prior to launch. List any specific instruction or tasks that will be needed

(7.3)  Facilitation:
Describe how facilitation of resources will be used to enable the students to be successful.

(7.4) Progress Monitoring:
Describe how program will be monitored throughout the project.

Group Progress 

         Individual Progress

 (7.5) Re-planning:
Describe how ‘re-planning’ will be used if the project goes off track

(7.6) Conflict Management:
Describe how to address problems related to participation, offer approaches to manage other conflicts that may arise.


PBL Lesson 6 - The Review Phase

PBL Lesson 6 - The Review Phase

Project Plan - Lesson 6
The Review Phase

(6.1)Student Reflection and Evaluation:
Describe how student reflection and evaluation will be conducted.

(6.2) Teacher Reflection and Evaluation:
Describe how teacher reflection and evaluation will be conducted.

(6.3) Assessment of 21st Century skills:
List of 21st century skills in this project and its assessment


(6.4) Summative Assessment and Grading:
List products and the corresponding rubrics that will be used for SA and Grading
ProductRubricsGrading




PBL Lesson 5 - The Do Phase

PBL Lesson 5 - The Do Phase

Project Plan – Lesson 5
The Do Phase

(5.1) Project Launch:
Describe how the project will be launched, including how goals, expectation, rules, procedures, assessment, and grading will be presented to the students.

(5.2) Artifacts:
List artifacts that will be created during the project

(5.3) Culminating product:
Describe what culminating product or products are expected to be created during the project and how they will be presented.

(5.4) Celebrating completion:
Describe how the students will celebrate when the project is completed.


PBL Lesson 4 - Work Plan

PBL Lesson 4 - Work Plan

Work plan-Lesson 4
Prepare work plan in the format given below.

Sl.
No
TASK
SUBTASK
ROLE
START DATE
END DATE
PRODUCT



















SAMPLE WORK PLAN      
                                                   Ha!Ha!Ha!..........

Sl.
No
TASK
SUBTASK
ROLE
START DATE
END DATE
PRODUCT
01
Launch project


20.11.07

20.11.07
Project launched
02
Deliver classroom instruction
Areas to be covered.
.1.Define the project
2.Culminating products

Teacher
21.11.07
22.11.07
Initial classroom instruction is completed
03
Group selection
Students’ list

Teacher
23.11.07
23.11.07
Group selection is completed
04
Conduct research
Collection of Content on 1.Dental care.
2.Common ailments(Curricular units)
Student
24.11.07
30.11.07
Students recorded in the computer
05
Perform survey
Create survey questions,survey,prepare survey report
Student
01.12.07
07.12.07
Collected report
06
Programme sheet activity
Prepared based on curricular units and problem areas  in daily life affecting health
Student and teacher
08.12.07
22.12.07
Prepared
07
Advice meeting
Team prepare briefs
All team members
05.01.08
05.01.08
A meeting was held
08
Programme sheet presentation
Presentation
,,
15.01.08.
22.01.08
Presented
09
Preperation of questionnaire
Eliciting from peer group and self analisation
Each member
24.01.08
29.01.08
Prepared questions
10
Lecture by Medical specialist
Dr.Muralidhar
Teacher
30.01.08
30.01.08
Completed
11
Exhibition
Practice presentation by inviting parents
All members
01.02.08
04.02.08
Completed
12
Project presentation
Posting in the computer/blog
All
05.02.08
09.02.08
Completed
10
Assessment and grading
Prepare rubrics and assessment
Teacher
10.02.08
10.02.08
Completed
11
Refection and evaluation
Student reflection and evaluation, Teacher refection and evaluation
Students and teacher
11.02.08
11.02.08
Completed.
12
Project closed
Submitting to the Principal
Teacher
12.02.08

Closed